[ 
https://issues.apache.org/jira/browse/AMBARI-13600?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andrii Tkach updated AMBARI-13600:
----------------------------------
    Attachment: AMBARI-13600.patch

> Allow The Removal Of Hosts in Maintenance Mode Via The Web Client During An 
> Upgrade
> -----------------------------------------------------------------------------------
>
>                 Key: AMBARI-13600
>                 URL: https://issues.apache.org/jira/browse/AMBARI-13600
>             Project: Ambari
>          Issue Type: Task
>          Components: ambari-web
>    Affects Versions: 2.1.0
>            Reporter: Andrii Tkach
>            Assignee: Andrii Tkach
>            Priority: Critical
>             Fix For: 2.1.3
>
>         Attachments: AMBARI-13600.patch
>
>
> During an upgrade, web client allow for a host to be placed into Maintenance 
> Mode in order for it to be excluded from the upgrade. Although there is work 
> planned to be able to finalize an upgrade with hosts that are in MM and 
> out-of-sync, in the short term there also needs to be the ability to remove 
> these hosts so that finalization can complete.
> The web client should expose the ability to remove hosts in MM during an 
> upgrade. This should only apply to hosts in MM. It can be made a part of the 
> RU wizard at the time of finalization or exposed in other areas of the UI.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to