[
https://issues.apache.org/jira/browse/AMBARI-13682?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14987498#comment-14987498
]
Hudson commented on AMBARI-13682:
---------------------------------
FAILURE: Integrated in Ambari-trunk-Commit #3762 (See
[https://builds.apache.org/job/Ambari-trunk-Commit/3762/])
AMBARI-13682. RU Progress: skipped failure during service check it has a
(ncole:
[http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=9ce6311f6c644b629e268101b3dd6ea8277c9fb4])
*
ambari-server/src/test/java/org/apache/ambari/server/controller/internal/CalculatedStatusTest.java
*
ambari-server/src/main/java/org/apache/ambari/server/controller/internal/CalculatedStatus.java
> RU Progress: skipped failure during service check it has a green tick mark
> ---------------------------------------------------------------------------
>
> Key: AMBARI-13682
> URL: https://issues.apache.org/jira/browse/AMBARI-13682
> Project: Ambari
> Issue Type: Bug
> Components: ambari-server
> Reporter: Nate Cole
> Assignee: Nate Cole
> Fix For: 2.1.3
>
> Attachments: AMBARI-13682.patch
>
>
> The status for SKIPPED_FAILED should be propagated instead of COMPLETED.
> Manually skipped item logic does not change.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)