Tejas Rawool created ATLAS-2484:
-----------------------------------
Summary: UI - Need validation for Start Date and End Date while
applying validity period
Key: ATLAS-2484
URL: https://issues.apache.org/jira/browse/ATLAS-2484
Project: Atlas
Issue Type: Bug
Affects Versions: 1.0.0-alpha
Reporter: Tejas Rawool
Fix For: 1.0.0
While assigning Tags to Entity, If Apply Validity Period is checked then Start
Date should not be greater then End Date and Time Zone should not accept empty
values.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)