This should not increase the queue time substantially, since precommit ITs
are running *sequentially* with precommit tests, unlike multiple precommit
tests which run in parallel to each other.

The precommit ITs we run are batch and streaming wordcount tests on Py2 and
one Py3 version, so it's not a lot of tests.

On Thu, Oct 24, 2019 at 1:07 PM Ahmet Altay <al...@google.com> wrote:

> +1 to separating ITs from precommit. Downside would be, when Chad tried to
> do something similar [1] it was noted that the total time to run all
> precommit tests would increase and also potentially increase the queue time.
>
> Another alternative, we could run a smaller set of IT tests in precommits
> and run the whole suite as part of post commit tests.
>
> [1] https://github.com/apache/beam/pull/9642
>
> On Thu, Oct 24, 2019 at 12:15 PM Valentyn Tymofieiev <valen...@google.com>
> wrote:
>
>> One improvement could be move to Precommit IT tests into a separate suite
>> from precommit tests, and run it in parallel.
>>
>> On Thu, Oct 24, 2019 at 11:41 AM Brian Hulette <bhule...@google.com>
>> wrote:
>>
>>> Python Precommits are taking quite a while now [1]. Just visually it
>>> looks like the average length is 1.5h or so, but it spikes up to 2h. I've
>>> had several precommit runs get aborted due to the 2 hour limit.
>>>
>>> It looks like there was a spike up above 1h back on 9/6 and the duration
>>> has been steadily rising since then. Is there anything we can do about this?
>>>
>>> Brian
>>>
>>> [1]
>>> http://104.154.241.245/d/_TNndF2iz/pre-commit-test-latency?orgId=1&from=now-90d&to=now&fullscreen&panelId=4
>>>
>>