Hi, the latest fulltest on CI-Server went "pretty well" with just one single test-failure [1] which IMHO is because that the delay by the second route there is "too" low causing the "mock:bar" receive more than 1 expected messages from time to time.
As I intend not to break anything :-) I attach a potential patch: http://camel.465427.n5.nabble.com/file/n5165676/org.apache.camel.impl.PendingExchangesTwoRouteShutdownGracefulTest.testShutdownGraceful.patch org.apache.camel.impl.PendingExchangesTwoRouteShutdownGracefulTest.testShutdownGraceful.patch to this post for your consideration! If this makes sense to you (I assume Claus is the best target to this question) feel free to apply it into the trunk or let me know if I should do that. BTW the Jenkins "Age" of this test failure is "3". [1] https://builds.apache.org/job/Camel.trunk.fulltest/667/org.apache.camel$camel-core/testReport/ Babak -- View this message in context: http://camel.465427.n5.nabble.com/FEEDBACK-Newest-Test-Failure-on-the-CI-Server-tp5165676p5165676.html Sent from the Camel Development mailing list archive at Nabble.com.