Hi Babak, most of those are assigned to me and is ongoing work. Since
then I discovered issues with uris in a few other components. My
intention is to resolve as many as I can in 2.9.1. The idea is to pick
up the low hanging fruits now and for the 3.0 release all camel uris to
be proper uris.
In addition to these issues I am sure others will be resolved as well,
so I think the number of issues solved in 2.9.1 will be somewhere
between 80 and 100.
Cheers,
Hadrian
On 02/08/2012 09:04 AM, Babak Vahdat wrote:
Hi
Currently there're 17 open tickets most of them were postponed to 2.9.1 as
there was the intention to bring 2.9.0 out the door, mostly regarding the
proper URI format/usage stuff, etc.
Would be the idea to postpone these tickets again to another 2.9.x release
or can it be managed to resolve them properly by this target release?
Babak
--
View this message in context:
http://camel.465427.n5.nabble.com/DISCUSS-Camel-2-9-1-Release-tp5463566p5466569.html
Sent from the Camel Development mailing list archive at Nabble.com.
--
Hadrian Zbarcea
Principal Software Architect
Talend, Inc
http://coders.talend.com/
http://camelbot.blogspot.com/