Hi all

Please be informed about JIRA upgrade this weekend.

Regards
Liang

---------- Forwarded message ----------
From: Chris Lambertus <[email protected]>
Date: 2017-06-10 12:28 GMT+08:00
Subject: JIRA upgrade / Downtime notification 12 June 0100 UTC
To: committers <[email protected]>
Cc: ASF Operations <[email protected]>, ASF Executive Assistant <
[email protected]>


All,

On Monday June 12th at 0100 UTC we will be shutting down and upgrading the
production ASF Jira instance (issues.a.o/jira.) We will be upgrading to the
latest version of 6.4 in preparation for a near-future upgrade to 7.x. This
is a required upgrade as part of the 7.x migration process.

Downtime is presently estimated at 6 hours, as the instance will need to
perform a full offline re-index as part of the upgrade.

Updates to the ETA will be presented via ASF Infrabot twitter.

-Chris




-- 
Regards
Liang

Attachment: signature.asc
Description: PGP signature

Reply via email to