On 19/06/2008, at 1:29 AM, Andrus Adamchik wrote:
Maybe now is a good time to create 4.0 and 3.1 milestones and start
triaging tasks into those?
You mean like a Wiki page (not an SVN branch)? Yeah sure we can do
that.
I meant in Jira. I think the most important thing if we want to
release 3.0 is to not let feature creep allow the release to be
sidetracked. And one tool for that is Jira. Having all new tasks drop
into '4.0' by default and only be manually moved down into 3.0 is a
start.
Ari
-------------------------->
ish
http://www.ish.com.au
Level 1, 30 Wilson Street Newtown 2042 Australia
phone +61 2 9550 5001 fax +61 2 9550 4001
GPG fingerprint CBFB 84B4 738D 4E87 5E5C 5EFA EF6A 7D2E 3E49 102A