On 19/06/2008, at 1:29 AM, Andrus Adamchik wrote:

Maybe now is a good time to create 4.0 and 3.1 milestones and start triaging tasks into those?

You mean like a Wiki page (not an SVN branch)? Yeah sure we can do that.

I meant in Jira. I think the most important thing if we want to release 3.0 is to not let feature creep allow the release to be sidetracked. And one tool for that is Jira. Having all new tasks drop into '4.0' by default and only be manually moved down into 3.0 is a start.

Ari





-------------------------->
ish
http://www.ish.com.au
Level 1, 30 Wilson Street Newtown 2042 Australia
phone +61 2 9550 5001   fax +61 2 9550 4001
GPG fingerprint CBFB 84B4 738D 4E87 5E5C  5EFA EF6A 7D2E 3E49 102A


Reply via email to