rlenferink commented on PR #820: URL: https://github.com/apache/celix/pull/820#issuecomment-3950938965
I have just re-ran these steps with a clean repo and clean container cache, and I can safely say that the projects opens, builds, a full re-build works as well and following the steps in the README, the `All CTest` works as well: ``` 100% tests passed, 0 tests failed out of 47 Total Test time (real) = 228.63 sec ``` Following the steps to run an individual test work as well. I couldn't get it to work that the configuration is applied to multiple tests, but IMO that is a real nice-to-have. With that I think this is ready to be merged. -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
