I've made a small update to the projects LTS cycle on the wiki here:
https://cwiki.apache.org/confluence/display/CLOUDSTACK/LTS

Previously the page listed had a period of 2 months at the beginning of each 
LTS release for stabilisation activities.  (i.e. months 1-2 of every new 
release was meant to be spent stabilising a release  before it was pronounced 
as being LTS)

Total LTS cycle duration was therefore 20 months (those 2 initial months plus 
the 18 month cycle)


AFAIK, we've never actually done that initial stage - a designated LTS release 
is seen as being in the LTS cycle from its day of release
I've therefore removed that initial step and changed the page to describe the 
18 month cycle

I've made the update (it was just annoying me)  - happy to revert if anybody 
objects






Kind regards
Giles