Guido Casper wrote:

Michael Wechner wrote:

Johan Stuyts wrote:



Conclusion
----------
IMHO there should be more consensus about what is needed and what is feasible in a relatively short time, e.g. half a year to a year.


I think building a generalized workflow based on a standard is too ambitious. Leaving out some more complex constructs decreases usability. It might be an option to choose a (proper) subset of a standard with which a large percentage (definitely more than 80%. Having to resort to another solution in one of four situations is not acceptable) of use cases can be implemented.




I would suggest to start on an existing code base, e.g. Lenya or whatever, make
an appropriate Cocoon block out of it (there had been a list of requirements to meet)
and start from there.


If that goes along with some documentation :-) and an isolated sample I'm +1


agreed. In case we agree on the Lenya workflow as initial workflow bloc, then we should
probably work down the list provided by Carsten:


http://article.gmane.org/gmane.comp.cms.lenya.devel/2902

Michi


Guido


Else I guess discussions just keep going forever ;-)

The existing code base might not satisfy everybody, but at least it's something
concrete to start with, even if it will be totally modified resp. refactored in the end.


Michi





--
Michael Wechner
Wyona Inc.  -   Open Source Content Management   -   Apache Lenya
http://www.wyona.com              http://cocoon.apache.org/lenya/
[EMAIL PROTECTED]                        [EMAIL PROTECTED]



Reply via email to