On 10/03/2008, Rory Winston <[EMAIL PROTECTED]> wrote: > Hi Sebb > > A couple of things: > > 1. Which tests are you referring to in your first point below?
testFeb29IfLeapYear(org.apache.commons.net.ftp.parser.FTPTimestampParserImplTest) testFeb29LeapYear(org.apache.commons.net.ftp.parser.FTPTimestampParserImplTest) The first one only applies in leap years - it was designed before the addition of the server calendar parameter. It could perhaps be dropped. I've since fixed the following test, and it also fails, but only on 1.4: testFeb29NonLeapYear(org.apache.commons.net.ftp.parser.FTPTimestampParserImplTest) > 2. Does the assumption have anything to do with the lenientFutureDates > flag in FTPTimestampParserImpl? > Yes, the *nix future dates thing is tied in with lenientFutureDates. I suspect there may need to be a new flag which enables *nix style +/- 6 months dates. I don't understand what the lenient flag is about - was it part of an attempt to handle *nix dates (in which case it's wrong, as lenient allows up to 1 year in arrears), or is it for different OSes? The past and future date tests need extending as well; there should be one test where the current date is in the first 6 months of the year, and another where it is in the second 6 months of the year (and perhaps leap/non-leap years too). > Rory > > > sebb wrote: > > I've committed updates to the FTPTimestampParserImplTest classes in > > trunk and NET_2_0. > > > > The 2 additional tests for Feb 29 fail on Java 1.3/1.4. > > > > Both trunk (Java 1.3/1.4) and NET_2_0 (Java 1.5+) now fail on short > > dates that fall in a different year from current (previous or next). > > > > Some of the existing tests assume that dates cannot be more than 1 > > hour in the future - IMO this is wrong - so I propose to drop these > > tests. > > > > I'm working on a patch which I'll add as a patch to NET-188. > > > > On 09/03/2008, Rory Winston <[EMAIL PROTECTED]> wrote: > > > >> Sure, you can just add them directly yourself if you like. > >> > >> Rory > >> > >> > >> The *nix short date formatting fixes don't currently have any tests, > >> at least when I last checked. > >> > >> I think these need to be added first. > >> > >> I can add some later today if that's OK with you? > >> Or do you want them done as patches via Jira? > >> > >> > >> On 09/03/2008, Rory Winston <[EMAIL PROTECTED]> wrote: > >> > Hi James > >> > > >> > Yes, I'm going to cut new RCs for 1.5 and 2.0. > >> > > >> > Thanks > >> > > >> > Rory > >> > > >> > <snip/> --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]