[ 
https://issues.apache.org/jira/browse/RAT-530?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Philipp Ottlinger updated RAT-530:
----------------------------------
    Description: 
* (/) Fix download page to comply with current ASF rules
 * (/) Use Maven 3.9.13 in order to not run into the parallel upload to Nexus 
problem introduced with Maven 3.9.12, reported in 2026-02
 * Jira adjustments
 ** (/) close all resolved tasks in 0.18 and older releases, except for RAT-530 
and RAT-498 ;)
 ** (/) closed old resolved tasks/subtasks and transition to closed (112 tasks 
affected)
 ** edit release information and merge with changes.xml
 * Changelog - see RAT-498
 * (/) Helper/Buildscripts
 * (/) Webpage preview in creadur-site project - 
[https://creadur.apache.org/rat018/]
 * (/) Prepare master branch for 0.18-SNAPSHOT

  was:
* (/) Fix download page to comply with current ASF rules
 * (/) Use Maven 3.9.13 in order to not run into the parallel upload to Nexus 
problem introduced with Maven 3.9.12, reported in 2026-02
 * Jira adjustments
 ** (/) close all resolved tasks in 0.18 and older releases, except for RAT-530 
and RAT-498 ;)
 ** edit release information and merge with changes.xml
 * Changelog - see RAT-498
 * (/) Helper/Buildscripts
 * (/) Webpage preview in creadur-site project - 
[https://creadur.apache.org/rat018/]
 * (/) Prepare master branch for 0.18-SNAPSHOT


> Prepare a 0.18 release
> ----------------------
>
>                 Key: RAT-530
>                 URL: https://issues.apache.org/jira/browse/RAT-530
>             Project: Apache RAT
>          Issue Type: Task
>            Reporter: Philipp Ottlinger
>            Assignee: Philipp Ottlinger
>            Priority: Major
>             Fix For: 0.18
>
>
> * (/) Fix download page to comply with current ASF rules
>  * (/) Use Maven 3.9.13 in order to not run into the parallel upload to Nexus 
> problem introduced with Maven 3.9.12, reported in 2026-02
>  * Jira adjustments
>  ** (/) close all resolved tasks in 0.18 and older releases, except for 
> RAT-530 and RAT-498 ;)
>  ** (/) closed old resolved tasks/subtasks and transition to closed (112 
> tasks affected)
>  ** edit release information and merge with changes.xml
>  * Changelog - see RAT-498
>  * (/) Helper/Buildscripts
>  * (/) Webpage preview in creadur-site project - 
> [https://creadur.apache.org/rat018/]
>  * (/) Prepare master branch for 0.18-SNAPSHOT



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to