[ 
https://issues.apache.org/jira/browse/CRUNCH-294?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Josh Wills updated CRUNCH-294:
------------------------------

    Attachment: CRUNCH-294.patch

The patch. Passes all existing integration tests.

> Cost-based job planning
> -----------------------
>
>                 Key: CRUNCH-294
>                 URL: https://issues.apache.org/jira/browse/CRUNCH-294
>             Project: Crunch
>          Issue Type: Improvement
>          Components: Core
>            Reporter: Josh Wills
>            Assignee: Josh Wills
>         Attachments: CRUNCH-294.patch
>
>
> A bug report on the user list drove me to revisit some of the core planning 
> logic, particularly around how we decide where to split up DoFns between two 
> dependent MapReduce jobs.
> I found an old TODO about using the scale factor from a DoFn to decide where 
> to split up the nodes between dependent GBKs, so I implemented a new version 
> of the split algorithm that takes advantage of how we've propagated support 
> for multiple outputs on both the map and reduce sides of a job to do 
> finer-grained splits that use information from the scaleFactor calculations 
> to make smarter split decisions.
> One high-level change along with this: I changed the default scaleFactor() 
> value in DoFn to 0.99f to slightly prefer writes that occur later in a 
> pipeline flow by default.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to