[ https://issues.apache.org/jira/browse/CRUNCH-418?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14029308#comment-14029308 ]
Allan Shoup commented on CRUNCH-418: ------------------------------------ My preference would be to have it logged at info level (hence my suggestion to be able to configure the level that it be logged to). I suggested the default level be debug because I'm assuming not everyone would want that amount of content written to the log every time. Regarding the use case, yes, I would go through the log file, copy the contents, and create the image out of the contents. > Auto-logging Plan > ----------------- > > Key: CRUNCH-418 > URL: https://issues.apache.org/jira/browse/CRUNCH-418 > Project: Crunch > Issue Type: Wish > Reporter: Allan Shoup > Priority: Minor > > It would be handy if Crunch was capable of logging out the plan DOT diagram > automatically whenever the pipeline was run. > By default I would log the plan at a level below INFO - probably at DEBUG. > Additionally, configuration could be provided to specify the level that the > plan should be logged at (for example if you always wanted it logged at INFO > level, or if you wanted to disable logging the plan altogether). -- This message was sent by Atlassian JIRA (v6.2#6252)