[ 
https://issues.apache.org/jira/browse/CRUNCH-418?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14029308#comment-14029308
 ] 

Allan Shoup commented on CRUNCH-418:
------------------------------------

My preference would be to have it logged at info level (hence my suggestion to 
be able to configure the level that it be logged to). I suggested the default 
level be debug because I'm assuming not everyone would want that amount of 
content written to the log every time.

Regarding the use case, yes, I would go through the log file, copy the 
contents, and create the image out of the contents.

> Auto-logging Plan
> -----------------
>
>                 Key: CRUNCH-418
>                 URL: https://issues.apache.org/jira/browse/CRUNCH-418
>             Project: Crunch
>          Issue Type: Wish
>            Reporter: Allan Shoup
>            Priority: Minor
>
> It would be handy if Crunch was capable of logging out the plan DOT diagram 
> automatically whenever the pipeline was run.
> By default I would log the plan at a level below INFO - probably at DEBUG.
> Additionally, configuration could be provided to specify the level that the 
> plan should be logged at (for example if you always wanted it logged at INFO 
> level, or if you wanted to disable logging the plan altogether).



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to