Hi everybody, I've been running approximately 1million notes through the CPE pipeline of the ctakes/ytex branch.
I'm around 700k notes through, but the VM in which I am running the pipeline has its resources fully allocated to the pipeline. I'm trying to run some data processing side-by-side with it which requires more heap space for the JVM. So my question is, does hitting the pause button on the CPE disrupt the pipeline? Aka, can I resume the pipeline after pausing it without losing any information? Clayton Turner