On Mon, Feb 7, 2011 at 6:03 PM, Alex Karasulu <[email protected]> wrote:
> Hi all,
> Now with this check pointed merge back to trunks which is about to happen in
> 15-20 minutes after some super clean, build, test, run of studio etc, we can
> release shared 1.0-m1 if y'all like. Here's a release plan that Pierre and I
> discussed:
> (0) confirm a stable build in trunk with merge
> (1) commit merge back to trunk
> (2) assign release manager
> (3) modify pom's for new 1.0-m1 version
> (4) confirm stability
> (5) tag, kick off vote
> (6) if vote passes, release
> (7) merge back trunk changes with 1.0-m2-SNAPSHOT version into m1
> (8) rename m1 branches to m2
> In the meantime right after step #1 we can still continue work on stage II
> in the m1 branch.
> Thoughts?

I'd volunteer as RM so Alex, Emmanuel and Pierre-Arnaud can continue
without slowdown.

Kind Regards,
Stefan