Hi, Did you say that something was missing refers to the second mailing list 
thread?

First,The Apache DolphinScheduler(Incubating) 1.2.0 test build (round 3) threads
https://lists.apache.org/thread.html/8201cc5deba2ae846da632a61734873b7bf078335b75726bba02938a@%3Cdev.dolphinscheduler.apache.org%3E

Second,The checks about the Apache DolphinScheduler(Incubating) 1.2.0 test 
build (round 3) threads
https://lists.apache.org/thread.html/10880d751d0e2a8f2bf9d21bcc72ef21ee1183219ab3514903a01518@%3Cdev.dolphinscheduler.apache.org%3E


________________________________
DolphinScheduler(Incubator) PPMC
Gang Li 李岗

[email protected]<mailto:[email protected]>

From: Justin Mclean<mailto:[email protected]>
Date: 2019-12-04 14:06
To: [email protected]<mailto:[email protected]>
Subject: Re: [ANNOUNCE]Apache DolphinScheduler(Incubating) 1.2.0 test build 
(round 3) available

Hi,

I still slightly confused, but I'm obviously missing something.

> They are doing tests before release check, so the binary tar should be
> packaged, source tagged. Then the team could test this tar(s), and make
> sure features are ready.

Wouldn't they check that while doing the vote? Any connivance binary has to 
100% match the source code in the voted on source release.

> Then they will use the same tar balls to do PPMC vote, then IPMC.

It's highly unusual to vote on a binary release on its own. Apache projects 
make and release source code not binaries.

It's very likely they will need to do another vote on the release, as in it 
current form the source release is unlikely to pass an IPMC vote. (See my 
previous email).

Thanks,
Justin

Reply via email to