schema 3 +1
i prefer that the code is 'none of business with business logic'

[email protected] <[email protected]> 于2020年12月9日周三 上午10:52写道:

> Schema 3  +1
> I prefer schema 3 of the coding design.
> I think it's better to provide a generic design.
>
>
>
> Best Regards
>
> DolphinScheduler(Incubator) PPMC
> Gang Li 李岗
>
> [email protected]
>
> From: leon bao
> Date: 2020-12-07 23:56
> To: dev
> Subject: [DISCUSS]Code solution for project/workflow/task
> ##1. Background
>
> *It is suggested to take a look at the design scheme of splitting workflow
> JSON*
>
> the mail link about json splitting:
>
>
>
> https://lists.apache.org/thread.html/r84ed046de63899476f067dd207496428812a8687045bb4485072ee2d%40%3Cdev.dolphinscheduler.apache.org%3E
>
> The current business coding is proposed to be designed on the basis of
> splitting workflow JSON, with three purposes:
>
> -The references among workflow, relationship and job, and the external
> reference of dependent job and sub workflow job are described by project
> code, workflow code and business code
>
> -It supports the version management of workflow, job and resource, and
> provides a stable business code
>
> -Solve the problems of workflow, job copy, migration, export and import
> scene ID auto increment, conflict and so on
>
> ##2. Coding design
>
> ###2.1 scheme I
>
>
> Project table, workflow table and job table introduce a new business code
> field
>
> User manual input / automatically generated by the system. Here, the UI
> prompts the user to input the code. Internal reference is established
> through the code. Subsequent modification costs are high
>
> Project code is globally unique; workflow code and job code are project
> level unique
>
> Because the possibility of business code modification is very low, all
> codes in the current design do not support modification. The purpose of
> code modification can be achieved through the function of export and import
>
> When the workflow and job are copied, the user needs to input the new
> business code, and the system will check the conflict
>
> When the workflow and job are exported and imported, the business code
> (which can be edited) is displayed on the UI, and the user can choose
> whether to change the business code; when exporting, the UI adds the option
> of whether to export dependent jobs at the same time
>
> When the workflow and job are migrated, the business code (which can be
> edited) is displayed on the UI, and the user can choose whether to change
> the business code; the project code can be directly updated after the
> migration
>
> ###2.2 scheme 2
>
> On the basis of scheme 1, there will be three description words: code,
> name, description. Code and name are likely to be repeatedly entered in
> practical application, while description is rarely used. Therefore, the
> current scheme is to replace code with name without adding a code field. As
> for the input of English name or Chinese name, it is up to the user to
> decide whether to input English name or Chinese name, and whether to use
> description for specific function description field
>
> ###2.3 scheme 3
>
> Project code, workflow code and job code are globally unique. They are only
> responsible for the uniqueness of identification data and are not related
> to business. They are automatically generated by the system and do not
> provide page modification methods.
>
>     1. Workflow, job create new workflow (task) / copy workflow from
> template: generate new definition_ code/task_ code
>
>     2. Export: export exports all the contents of the current project /
> workflow / task as a JSON file
>
>     3. Import: check the definition_code/task_code exist
>
> -If it is a duplicate of definition_code/task_code in another project , you
> will be prompted and the import failed.
>
> -If it is the same as the definition_code/task_code in this project , you
> will be prompted to override
>
> -If there is no duplicate, all codes remain unchanged
>
> ##Design relation 3
>
> The project code field is maintained in the workflow table to identify
> which project the workflow belongs to
>
> The relation table maintains the item code and workflow code fields, and
> identifies the workflow of which project the relationship belongs
>
> The relation table maintains the project code and job code of the reference
> node (supports jobs that reference other projects)
>
> The item code is maintained in the operation table to identify which
> project the job belongs to
>
> The referenced workflow / job is determined by project code, workflow code
> and job code
>
> The referenced workflow is determined by item code and workflow code in sub
> workflow--
>
> ====================================================================
>
>
> ## 1.背景
>
> *建议先看一下拆分工作流json的设计方案*
>
> 关联邮件地址:
>
>
>
> https://lists.apache.org/thread.html/r84ed046de63899476f067dd207496428812a8687045bb4485072ee2d%40%3Cdev.dolphinscheduler.apache.org%3E
>
> 当前业务编码是建议在拆分工作流json基础上设计的,目的有3个:
>
> - 工作流、关系、作业之间的引用,以及依赖作业、子工作流作业对外部的引用通过项目编码、工作流编码、业务编码进行描述
> - 支持工作流、作业、资源的版本管理,提供一个稳定不变的业务编码
> - 解决工作流、作业的复制、迁移、导出导入场景的ID自增、冲突等问题
>
> ## 2.编码设计
>
> ### 2.1 方案一
>
> 项目表、工作流表、作业表引入一个新的业务编码字段
>
> 用户手工输入/系统自动生成,这里UI提示建议用户输入编码,内部通过编码建立引用,后续修改成本高
>
> 项目编码全局唯一;工作流编码、作业编码项目级唯一
>
> 因为业务编码修改的可能性非常低,所以当前设计所有编码都不支持修改,可以通过导出导入功能达到修改编码的目的
>
> 工作流、作业复制时,需要用户输入新业务编码,系统做冲突检查提醒
>
> 工作流、作业导出导入时,UI上显示业务编码(可编辑),用户可以选择是否变更业务编码;导出时UI增加是否同时导出依赖作业选项
>
> 工作流、作业迁移时,UI上显示业务编码(可编辑),用户可以选择是否变更业务编码;迁移直接更新项目编码就可以了
>
> ### 2.2 方案二
>
>
> 在方案一基础上,会有三个描述字:code、name、description,code和name在实际应用中很可能是重复输入的,而description又很少应用,所以当前方案是用name替换code,不需要新增code字段,至于输入英文name还是中文name由用户自己决定,段具体的功能描述还是用description字段
>
> ### 2.3 方案三
>
>         项目编码、工作流编码、作业编码全局唯一,只负责标识数据的唯一,不和业务相关,由系统自动生成,不提供页面修改方式。
>
>         1. 工作流、作业从模板创建新工作流(任务)/复制工作流: 生成新的definition_code/task_code
>
>         2. 导出: 导出将当前项目/工作流/任务所有内容导出为json文件
>
>         3. 导入: 检查definition_code/task_code是否存在
>
>             - 如果和别的项目的definition_code/task_code重复,则提示并导入失败。
>             - 如果和本项目内definition_code/task_code重复,则提示覆盖
>             - 如果没有重复的,则所有code不变导入
>
> ## 3.引用关系设计
>
> 工作流表维护项目编码字段,标识工作流归属于哪个项目
>
> 关系表维护项目编码、工作流编码字段,标识关系归属于哪个项目的工作流
>
> 关系表维护引用节点的项目编码、作业编码(支持引用其他项目的作业)
>
> 作业表维护项目编码,标识作业归属于哪个项目
>
> 依赖作业内部通过项目编码、工作流编码、作业编码确定引用的工作流/作业
>
> 子工作流内部通过项目编码、工作流编码确定引用的工作流
>
>
> DolphinScheduler(Incubator)  PPMC
> BaoLiang 鲍亮
> [email protected]
>


-- 
DolphinScheduler(Incubator)  PPMC
BaoLiang 鲍亮
[email protected]

Reply via email to