good job
I think what you have said is very comprehensive, you can start with this
proposal


Best Regards



---------------
Apache DolphinScheduler PMC Chair
David Dai
lidong...@apache.org
Linkedin: https://www.linkedin.com/in/dailidong
Twitter: @WorkflowEasy <https://twitter.com/WorkflowEasy>
---------------


On Thu, Sep 2, 2021 at 3:48 PM Xingjie Wang(联通集团联通数字科技有限公司) <
wangxj...@chinaunicom.cn> wrote:

> Hi community:
>
>
> The current workflow instances are scheduled to run in parallel, plan to
> submit workflow serial functionality.
>
> The functions include:
> 1. ProcessInstance of processDefinition that defines a serial plan will
> execute sequentially, that is, there will be at most one processInstance
> running.
> 2. Serial execution is divided into three policies (the processInstance
> described below belongs to the same processDefinition and defines the
> corresponding serial rules)
>
> (1) Serial waiting: When a new processInstance is generated, it is
> executed in sequence according to the order of the progress queue.
> (2) Serial discard: When a new processInstance is generated, if a
> processInstance (under the same processDefinition) is found , abandon
> thisprocessInstance , the state is stopped.
> (3) Serial priority: When a new processInstance is generated, if a running
> instance is found, stop this running processInstance.
>
> Implementation:
>
> Serial wait:
> 1. After the master reads the command, it generates a processInstance
> according to the existing logic,
> 2. Before saving, determine whether the serial plan is defined in the
> processDefinition, if not defined, continue to execute according to the
> original logic. If defined: Determine whether the processInstance under the
> processDefinition has a processInstance with the status of [Running: 1] or
> [Waiting Queue: 14] (newly added), and if there is, update the status to
> [Waiting Queue].
> 3. Save the processInstanceId to the processInstance where the
> nextProcessInstanceId field (newly added) is empty (here, if the
> processInstance just ends running, there will be problems, so before the
> end of the processInstance, judge if the serial plan is defined and the
> nextProcessInstanceId is empty, then Find the processInstance with the
> status of [Waiting Queue: 14] under the processDefinition and start it).
> 4. After the processInstance is executed, it is judged that if
> nextProcessInstanceId is not empty, a command is generated to resume the
> operation of the processInstance.
> Note: The operation of Part 3 will have concurrency after 2.0, so the
> database optimistic lock is used to solve the concurrency problem when
> saving the nextProcessInstanceId field.
>
> Serial discard:
> 1. After the master reads the command, it generates a processInstance
> according to the existing logic,
> 2. Before saving, determine whether the serial plan is defined in the
> processDefinition, if not defined, continue execution according to the
> original logic. If defined: Check whether there is a running process, and
> if there is a current process state, set it to stop.
>
> Serial priority:
> 1. After the master reads the command, it generates a processInstance
> according to the existing logic,
> 2. Before saving, determine whether the serial plan is defined in the
> processDefinition, if not defined, continue execution according to the
> original logic. If defined: Check whether there is a running process, and
> if there is, set the running process status to stop.
>
> Best Wishes!
>
>
> --------------------------------------------------------------------------------------------------------------------------------
>
> 目前工作流实例的运行计划均为并行,计划提交工作流串行功能
>
> 功能主要包括
>
> 1.定义了串行计划的processDefinition的processInstance会顺序执行,即最多只会有一个正在运行的processInstance。
>
> 2.串行执行分为三种策略(以下所描述的processInstance在属于同一processDefinition,并且该processDefinition定义了对应串行规则)
> (1)串行等待:生成新的processInstance时,按照进度队列的先后顺序依次执行。
>
> (2)串行抛弃:生成新的processInstance时,如果发现有正在运行的工作流实例(同一个processDefinition下)放弃运行,状态为停止。
> (3)串行优先:生成新的processInstance时,如果发现有正在运行的实例,停止该processInstance的运行。
>
> 实现方案:
> 串行等待:
> 1.master在读取command后,按照现有逻辑生成processInstance,
>
> 2.在保存之前判断该processDefinition中是否定义了串行计划,如果没有定义,按照原有逻辑继续执行。如果定义:判断该processDefinition下的processInstance是否有状态为【正在运行:1】或【等待队列:14】(新增)的processInstance,如果有将状态更新为【等待队列】。
>
> 3.将该processInstanceId保存到nextProcessInstanceId字段(新增)为空的processInstance中(此处如果该processInstance刚好结束运行会出现问题,所以在processInstance结束之前判断如果定义了串行计划,并且nextProcessInstanceId为空,则查找该processDefinition下状态为【等待队列:14】的processInstance并且启动)。
>
> 4.processInstance执行结束后判断nextProcessInstanceId如果不为空则生成command恢复该processInstance的运行。
> 注:第3部的操作在2.0后会出现并发情况,所以在保存nextProcessInstanceId字段时利用数据库乐观锁解决并发问题。
>
> 串行抛弃:
> 1.master在读取command后,按照现有逻辑生成processInstance,
>
> 2.在保存之前判断该processDefinition中是否定义了串行计划,如果没有定义,按照原有逻辑继续执行。如果定义:检查是否有正在运行的流程,如果有当前流程状态置为停止。
>
> 串行优先:
> 1.master在读取command后,按照现有逻辑生成processInstance,
>
> 2.在保存之前判断该processDefinition中是否定义了串行计划,如果没有定义,按照原有逻辑继续执行。如果定义:检查是否有正在运行的流程,如果有将正在运行的流程状态置为停止。
>
> 附件为处理串行部分的流程,如果您有更好的解决方案,或感觉本次方案存在问题请随时联系我。
>
> 祝好!
> 如果您错误接收了该邮件,请通过电子邮件立即通知我们。请回复邮件到 
> hqs-s...@chinaunicom.cn,即可以退订此邮件。我们将立即将您的信息从我们的发送目录中删除。
> If you have received this email in error please notify us immediately by
> e-mail. Please reply to hqs-s...@chinaunicom.cn ,you can unsubscribe from
> this mail. We will immediately remove your information from send catalogue
> of our.
>