hi,
can you describe the question clearly? the host load means the Master
or the Worker server? is there any server down?

Best Regards



---------------
Apache DolphinScheduler PMC Chair
LidongDai
[email protected]
Linkedin: https://www.linkedin.com/in/dailidong
Twitter: @WorkflowEasy
---------------

On Sun, Nov 21, 2021 at 3:59 PM 王峰 <[email protected]> wrote:
>
> doplhinscheduler 1.3.3 cluster
>
>
>
>
> There is such a scenario, because the host load is too high, master fault 
> tolerance may occur in the middle, and the same workflow instance is run 
> twice (two tasks are parallel in time), which causes the data to double.