Hi, Please find an update of the release status, inline below.
13/04/2018 00:01, Thomas Monjalon: > The integration deadline is passed by one week, and the first > release candidate is still far from being ready. > This time it is really, really late. > We will try to do this RC1 on the 20th of April, but no guarantee. .. no guarantee, indeed. There are 742 patches in master, 56 in next-net, 68 in next-crypto, and a lot more not yet merged. List of remaining significant patches for RC1: missing in next-net - runtime queue setup - new VXLAN and MPLS tunnels - generic IP/UDP tunnel offloads - tunnel encap/decap - flow API related fixes - flow API overhaul for switch offloads - rte_flow extension for vSwitch - switching devices representation missing in master: - secondary vdev - replace calls to rte_panic - control threads - symbolic log levels - devargs cleanup - device querying - mbuf external - mempool bucket driver > Then we may have a lot of new drivers or features to integrate > in the next release candidate. So we need to plan two weeks of work > before releasing the RC2 around the 4th of May, which was the date > initially targeted for the release 18.05. List of major patches for RC2: - compressdev - DPAA2 QDMA raw driver - DPAA2 Command Interface raw driver - Hyper-V bus and NetVSC PMD - Intel FPGA - BPF > Usually we need two more weeks of bug fixing in RC3 and RC4, > and few more days of validation before the release. > It means the release will happen on the 23rd of May in the "best case". > > During this time, we need everybody's help to finish the reviews.