Github user weijietong commented on the issue:

    https://github.com/apache/drill/pull/921
  
    @dvjyothsna thanks for your contribution. Some objections please consider, 
the shutdown process should be quick and allow fault occurred. Google calls it 
lame duck model. If your cluster is large and has high concurrent queries,the 
grace model will let the shutdown process and the service unavailable time both 
too long. 


---
If your project is set up for it, you can reply to this email and have your
reply appear on GitHub as well. If your project does not have this feature
enabled and wishes so, or if the feature is enabled but not working, please
contact infrastructure at [email protected] or file a JIRA ticket
with INFRA.
---

Reply via email to