Hi, all

As discussing before, we could start this in master(2.7.x) now.

The previous discuss thread:
https://lists.apache.org/thread.html/a981ec4fc34db42a246a83aa4a8ec9eaedd9322f94403788cac60898@%3Cdev.dubbo.apache.org%3E

Now, there also have 23 PRs under reviewing, we need to fix them first,
merge or close it. Then we rename the package ASAP.

After that, new PRs with bugfix need to be merged into 2.6.x and master,
other PRs with big changes or new feature only need to be merged into
master.

How do you guys think?

Best regards,
Jerrick

Reply via email to