Sowmya Ramesh created FALCON-1174:
-------------------------------------
Summary: Ability to disable oozie dryrun while scheduling or
updating the falcon process
Key: FALCON-1174
URL: https://issues.apache.org/jira/browse/FALCON-1174
Project: Falcon
Issue Type: Improvement
Components: oozie
Affects Versions: 0.6
Reporter: Sowmya Ramesh
Assignee: Sowmya Ramesh
Fix For: 0.7
Today, before scheduling or updating an entity Oozie dry run is done to
validate it. This validation helps as Oozie dry run is s a sync operation and
hence validation can be done before scheduling the job.
There may be a requirement where user would want to turn off this feature.
Improvement is to provide a config knob to skip the dry run.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)