[
https://issues.apache.org/jira/browse/FALCON-378?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13947586#comment-13947586
]
Shwetha G S commented on FALCON-378:
------------------------------------
+1
> Feed status fails with NPE post update when the new coordinator is in PREP
> state
> --------------------------------------------------------------------------------
>
> Key: FALCON-378
> URL: https://issues.apache.org/jira/browse/FALCON-378
> Project: Falcon
> Issue Type: Bug
> Components: oozie
> Affects Versions: 0.4
> Reporter: Venkatesh Seetharam
> Assignee: Venkatesh Seetharam
> Labels: oozie
> Attachments: FALCON-378-v1.patch, FALCON-378.patch,
> oozie-coord-new.tiff, oozie-coords.tiff, test-update-feed-1.xml,
> test-update-feed-2.xml, test-update-feed.xml
>
>
> An NPE is thrown for status calls post feed update briefly between the new
> coord creation transitioning from PREP to RUNNING at:
> {code}
> org.apache.falcon.workflow.engine.OozieWorkflowEngine#getCoordActions
> Date iterEnd = (coord.getNextMaterializedTime().before(end) ?
> coord.getNextMaterializedTime() : end);
> {code}
> coord.getNextMaterializedTime() is null since the coord is in PREP state as
> the new coord's effective time is set as now() + 3 min. In reality, this is
> greater than 3 mins is my observation.
> {code}
> Feed updated at:
> Current time = Tue, 25 Mar 2014 21:54:00 GMT
> Old Coord:
> Start time = Tue, 25 Mar 2014 00:00:00 GMT
> End time = Tue, 25 Mar 2014 22:00:00 GMT
> Status = RUNNING
> New Coord:
> Start time = Tue, 25 Mar 2014 22:00:00 GMT
> End time = Wed, 26 Mar 2014 00:00:00 GMT
> Status = PREP
> {code}
--
This message was sent by Atlassian JIRA
(v6.2#6252)