[ 
https://issues.apache.org/jira/browse/FALCON-705?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14178445#comment-14178445
 ] 

Ajay Yadav commented on FALCON-705:
-----------------------------------

Actual use case was that there was a feed which was not getting created. It was 
not attended till the time for it's entire retention period duration and hence 
all instances were lost. This should not be a problem in most of the cases. 
Also, instead of number of instances adding a storage quota based solution 
would be better was what we discussed.

> Feed Retention at Instance Level
> --------------------------------
>
>                 Key: FALCON-705
>                 URL: https://issues.apache.org/jira/browse/FALCON-705
>             Project: Falcon
>          Issue Type: New Feature
>          Components: retention
>            Reporter: Pracheer Agarwal
>
> Currently, while specifying retention in feed we need to give some time unit 
> and number of units like hours(6).
> It will be good to have feed retention on instance level like instances(5) 
> which shows I want to preserve last 5 instances.
> This feature is useful when whole pipeline starts after some time. So it that 
> case we don't have to approximate the retention.  



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to