[ 
https://issues.apache.org/jira/browse/FINERACT-7?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15795343#comment-15795343
 ] 

ASF GitHub Bot commented on FINERACT-7:
---------------------------------------

Github user abdulazizali77 commented on the issue:

    https://github.com/apache/incubator-fineract/pull/256
  
    @nazeer1100126 Hi, sorry i didnt run the integration test before. I did 
give the integration tests a run with and without the changes and it seems i 
get identical failures on ClientLoanIntegrationTest (and other tests).
    I will ascertain whether the two modified methods in the PR are called 
during any of the integration tests. From first glance however 
testLoanScheduleWithInterestRecalculation_WITH_REST_SAME_AS_REPAYMENT_INTEREST_COMPOUND_NONE_STRATEGY_REDUCE_EMI_WITH_INSTALLMENT_CHARGE
 doesnt seem to be calling Loan.generateInstallmentLoanCharges nor 
LoanCharge.updateInstallmentCharges. (possibly i am wrong)



> Repayment Schedule after waive fee not correct
> ----------------------------------------------
>
>                 Key: FINERACT-7
>                 URL: https://issues.apache.org/jira/browse/FINERACT-7
>             Project: Apache Fineract
>          Issue Type: Bug
>          Components: Loan
>            Reporter: Dayna Harp
>            Assignee: Markus Geiss
>         Attachments: 1.jpg, 2.jpg, 3.jpg
>
>
> https://mifosforge.jira.com/browse/MIFOSX-2495
> After waive installment fee the repayment schedule generated is not proper
> 1. Create Installment fee for a loan as 100-Flat-Regular. 
> 2. Create loan product with following datasets and attache above installment 
> fee to that.
> Terms vary based on loan cycle :      FALSE
> Principal:    10,000   ( Min: , Max : )
> Number of Repayments: 12   ( Min: , Max
> Repay Every:  1  Months
> Nominal Interest Rate:        1   ( Min: , Max  Per month
> Minimum days between disbursal and first repayment date       
> Amortization  Equal installments
> Interest Method       Declining Balance
> Interest Calculation Period   Daily
> Repayment Strategy    Overdue/Due Fee/Int,Principal
> Account moves out of NPA only after all arrears have been cleared?    No
> Days in year  Actual
> Days in month Actual
> Principal Threshold (%) for Last Instalment   0
> Allow fixing of the installment amount        No
> Interest Recalculation        
> Recalculate Interest  Yes
> Advance payments adjustment type      Reduce number of installments
> Pre-closure interest calculation rule Calculate till pre closure date
> Interest recalculation compounding on None
> Frequency for recalculate Outstanding Principal       Daily
> Frequency Interval for recalculation  1
> Frequency Date for recalculation      01-Jan-15
> Is Arrears recognization based on original schedule:No.
> 3. Submit new loan application on 01 October 2015. Approve and disburse loan 
> on same date.
> 4. Click on waive charge and select for 1st repayment.
> 5. Repayment schedule generated after waive charge is not proper
> >Waive charge is happening not for first installment instead for other 
> >installment it is happening.
> 6. For first repayment the due is getting displayed.
> Attachments here: https://mifosforge.jira.com/browse/MIFOSX-2495



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to