Till Rohrmann created FLINK-8392:
------------------------------------
Summary: Simplify termination future completion
Key: FLINK-8392
URL: https://issues.apache.org/jira/browse/FLINK-8392
Project: Flink
Issue Type: Sub-task
Components: Distributed Coordination
Affects Versions: 1.5.0
Reporter: Till Rohrmann
Assignee: Till Rohrmann
With FLINK-7754, we tried to complete the termination future after an {{Actor}}
has been completely stopped and has been removed from the {{ActorSystem}}.
This, however, is not possible. Furthermore, this change made it impossible
that a {{RpcEndpoint}} waits for the termination of another {{RpcEndpoint}} in
its {{RpcEndpoint#postStop}} method. Therefore, I propose to revert the changes
done by FLINK-7754.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)