Chesnay Schepler created FLINK-28127:
----------------------------------------

             Summary: Cancel during stop-with-savepoint may still create 
savepoint
                 Key: FLINK-28127
                 URL: https://issues.apache.org/jira/browse/FLINK-28127
             Project: Flink
          Issue Type: Bug
          Components: Runtime / Coordination
    Affects Versions: 1.15.0
            Reporter: Chesnay Schepler


If the job is cancelled while a stop-with-savepoint is happening, then the 
savepoint may complete at the same time the cancellation is triggered, without 
being reported to the user via the REST API.
This is because the checkpoint coordinator does not run in the main thread, so 
it might happen that the final task acknowledge is handed over, immediately 
followed by a cancellation.

This chances of this happening are very low, but nevertheless we should figure 
out a solution.



--
This message was sent by Atlassian Jira
(v8.20.7#820007)

Reply via email to