Roman Khachatryan created FLINK-33590:
-----------------------------------------
Summary: CheckpointStatsTracker.totalNumberOfSubTasks not updated
Key: FLINK-33590
URL: https://issues.apache.org/jira/browse/FLINK-33590
Project: Flink
Issue Type: Bug
Components: Runtime / Checkpointing, Runtime / Coordination
Affects Versions: 1.18.0
Reporter: Roman Khachatryan
Assignee: Roman Khachatryan
Fix For: 1.18.1
On rescaling, the DoP is obtained from the JobGraph.
However, JobGraph vertices are not updated once created. This results in
missing traces on rescaling (isComplete returns false).
Instead, it should be obtained from DoP store.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)