Hi folks, As mentioned in [1], this FLIP represents the 2nd phase to add Blue/Green deployments support.
This phase adds the capability to coordinate, in a more granular and extensible way, the transition between the 2 jobs. Here’s the Google Doc: https://docs.google.com/document/d/1ee-75ZFp7wKl4QQqs3QdfuQ5H5mVcaq-v3bthqST6JY/edit?tab=t.0 If you haven’t done so please go through Phase 1’s FLIP. Again, thanks everyone in advance - Sergio [1] https://lists.apache.org/thread/rww6f7sw4lwh1tfdh66jt8oh7ny70xll