Alan Zhang created FLINK-37567:
----------------------------------

             Summary: Flink clusters not be clean up when using job 
cancellation as suspend mechanism
                 Key: FLINK-37567
                 URL: https://issues.apache.org/jira/browse/FLINK-37567
             Project: Flink
          Issue Type: Improvement
            Reporter: Alan Zhang


In general, for application mode, the Flink cluster lifecycle should be tight 
with the Flink job lifecycle, which means we should delete the Flink cluster if 
the job stopped.

However, I noticed that Flink clusters are not deleted when I tried to suspend 
FlinkDeployment with "job-cancel" enabled. The CR shows the job under 
"CANCELED" state, but the underlying Flink cluster is still running.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to