Hi, devs, This is the third release sync summary for Flink 2.2 after feature freeze, I'd like to share the information about this release.
- Release Testing: There are totally 10 FLIPs[1] in Flink 2.2. There are 2 FLIPs left for cross-team testing, which are all assigned. The cross-team test is expected to be completed by the end of this week[2]. - Blocker: No blocker so far, it's going well. - Sync meeting: The next meeting time is 11/26/2025, Please feel free to join us[3]! [1] https://cwiki.apache.org/confluence/display/FLINK/2.2+Release [2] https://issues.apache.org/jira/browse/FLINK-38648 [3] https://meet.google.com/gdf-xuvn-mkj Best, Hang
