Time: PST time 11PM, April 28
CEST time 8 AM, April 29 China Standard Time 2PM, April 29 Attendants: Manu, Huafeng, Sean, Weihua, Stanley, Karol, Kam, Tomek Notes recorder: Kam Completed last week: 1. GEARPUMP-22 akka-streams materializer. (Kam, Sean) Design document <https://docs.google.com/document/d/1ixP1d1t0LhU1pgjgPpcvOJqA2CyU5VlO5FljWMe5qpg/edit> uploaded Issue opened for akka team. Allow different ActorMaterializer subtypes <https://github.com/akka/akka/issues/20414> 2. GEARPUMP-7 master members not updated (Sean). Done 3. GEARPUMP-28 gearpump logo. Uploaded gearpump logo from Shari of TAP team to [email protected] discussion thread (Kam) 4. Imported 17 PRS which were committed during the transition time of Apache code importing (Huafeng). Done 5. Provided status report to apache beam on gearpump runner and ML agnostic DSL (Kam, Manu) ML agnostic design <https://docs.google.com/document/d/17cRZk_yqHm3C0fljivjN66MbLkeKS1yjo4PBECHb-xA/edit> document uploaded and sent to Beam team (Kam) 6. Completed issue migration to JIRA (All) Done 7. Website PR submitted by stanley Next week: 1. GEARPUMP-22 Submit PR and reenable experiments/akka-stream (Kam) 2. GEARPUMP-46 track serde latency (Stanley). Submit PR. Create Backend JIRA describing what's needed (Huafeng). 3. GEARPUMP-28 gearpump logo. Try and close on LOGO candidates. Take vote. 4. GEARPUMP-18 update travis to publish snapshots and releases to apache repo (Kam). Update Build.scala - try and stage to repository.apache.org (Kam) 5. GEARPUMP-20 "ClientContext has not loaded the default config" (Manu). Manu to outline issues, solicit feedback. 6. GEARPUMP-82 rename package name to org.apache.gearpump (All). Huafeng will let everyone know - 2 day freeze. We need to close existing PR's. Once all PR's are closed then Huafeng can start. Any current work will need to be rebased. 7. Apache beam on gearpump runner and ML agnostic DSL (Kam, Manu) Continue to evolve ML agnostic design <https://docs.google.com/document/d/17cRZk_yqHm3C0fljivjN66MbLkeKS1yjo4PBECHb-xA/edit> document (Kam) Submit Gearpump Runner PR (Manu) vipshop will do small experimental project using beam + gp runner. Manu can perhaps help w/ latest runner (Manu, Weihua) 8. Open an issue and list the source and sinks we want to support in priority, and what additional examples we want (Karol) Redis sink (weihua would like this as a priority), cassandra sink, tair (alibaba kv store), hdfs sink, IoT mqtt source (Karol to create JIRA and suggest priorities and links. Storm has mqtt, redis connectors (Manu to evaluate and comment) 9. Initiate the discussion on the first roadmap after the Apache incubation 2-3 months what do we want to do (Kam create JIRA with roadmap ideas - team can comment) 10. website PR submitted by stanley team should commit so Stanley can check in and put online merge PR and put it on gearpump.io. https://github.com/gearpump/gearpump.github.io/pull/58
