Hi Geode Community,

I'm interested in serving as a member of the security response team to
support the Security Lead role.

Thanks
Yao Pian



On Wednesday, October 21, 2026 at 06:58:28 AM EDT, Jinwoo Hwang via dev <
[email protected]> wrote: Hello Apache Geode Dev Community, First,
thank you. Because of the time and care so many of you have given over the
past year, Apache Geode now ships on an established quarterly release
cadence. That is a real achievement, and it belongs to all of us. I'd like
to propose that we commit to this cadence as a project. Regular,
predictable releases help keep Geode relevant, safe, and secure: they
deliver security fixes to our users on schedule and show that Apache Geode
is an active, dependable platform to build on. Holding that cadence can't
depend on one or two people. So I'm proposing nine essential project roles,
each with a named owner and a backup, and asking for volunteers to commit
to them. These are Apache Geode community roles, not ASF positions, but
each one is essential: if a role sits empty, a release or a security fix
slips. OPEN TO EVERYONE (contributors, committers, PMC) 1. CI & Build
Infrastructure Lead (3-5 h/week)   Keeps builds green and release pipelines
working, fixes flaky tests. 2. Documentation & Website Lead (1-2 h/week,
more around releases)   Keeps docs, the website, and the downloads page
current for each release. 3. Pull Request Triage Lead (2-3 h/week)
Watches incoming pull requests, assigns reviewers, and makes sure every
PR, especially from first-time contributors, gets a timely review.   Also
maintains good-first-issues. 4. Outreach & Communications Lead (1-2 h/week,
more around releases)   Release announcements, blog posts, talks, social
media.   Niall has been our de facto Outreach Lead, and I propose we
formalize   that with him as owner. A backup is still needed. 5. User
Community Lead (1-2 h/week)   Answers user@ questions and gathers user
stories and upgrade feedback. COMMITTERS OR PMC MEMBERS 6. Release Manager,
2.0.x line (about 4+ h/week) 7. Release Manager, 1.15.x line (about 4+
h/week)   The second most demanding role, with more time in the weeks
before a   release. Owns each release for their line: backport essential
fixes,   verify them, run regression testing, then build, sign, run the
vote,   publish, announce, on our quarterly release cadence. Both lines
take   the same amount of work.   Per our release guide, a committer can
serve as Release Manager but   needs a PMC member for the svn checkout in
prepare_rc and for publishing   to dist/release/geode in promote_rc. Votes
need three binding +1s from   PMC members.
https://cwiki.apache.org/confluence/spaces/GEODE/pages/95650143/Releasing+Apache+Geode
PMC MEMBERS ONLY 8. Security Lead (about 8+ h/week, more during active CVE
periods)   This is the most time-intensive role, so a strong backup who can
share   weekly triage is especially important.   Triages private
vulnerability reports and dependency CVEs, and makes   sure fixes are ready
for each quarterly release. 9. Board Report Coordinator (about 3 h per
quarter)   Drafts the quarterly Board report with input from the other role
  owners, and prepares it for the PMC Chair to review and submit. Can
rotate. WHAT I'M ASKING Please reply by October 28th with: 1. The role(s)
you'll own or back up 2. Confirmation that you can commit to the role.
Release Managers and the   Security Lead also commit to our quarterly
release cadence. 3. Your expected time: steady (1-2 h/week), active (3-5
h/week), or   core (8+ h/week) If you can't take a role, voting on release
candidates within the 72-hour window is also essential, and that commitment
is very welcome too. I'll post the full roster of owners and backups here
once replies are in. Best regards, Jinwoo Hwang (he/him/his) Apache Geode /
SASĀ® Research and Development http://JinwooHwang.com
<http://jinwoohwang.com/><http://jinwoohwang.com/>

Reply via email to