We started off our week of Geode Bug Squashathon with 6 volunteers fixing 12 tickets (with 4 more in-progress). The UnitTests and IntegrationTests are predominantly green. We had a number of failures caused by git timeouts and we hit 2 intermittent failures in IntegrationTests for which we filed bugs. The DistributedTests target continues to see 1-3 test failures each run. So far the failures we've fixed have been bugs (race conditions, etc) in the test code itself.
Geode Builds: UnitTests: 11 PASS, 2 FAIL IntegrationTests: 50 PASS, 7 FAIL DistributedTests: 0 PASS, 19 FAIL Geode JIRA Tickets: Previously Open: 52* Filed: 17 Fixed: 12 In Progress: 4 Remaining Open: 53 * 5 of the tickets are for HDFS DUnit tests which will be moved with the incomplete HDFS feature from develop to a feature branch. If you haven't joined in yet, please consider joining in this week! Thanks, Kirk [image: Inline image 2] [image: Inline image 3]
