+1 On Tue, Mar 23, 2010 at 6:47 AM, Eric Lemoine <[email protected]>wrote:
> Hi > > With all the "milestone 0.7" tickets now closed, I'd like to start the > release procedure (as documented in [*]). > > Are PSC members ok with that? Please vote. As always everyone is > invited to give opinion. > > As discussed during the last IRC meeting GeoExt 0.7 will be released > after OpenLayers 2.9. In the mean time GeoExt 0.7 release candidates > will be done. > > Thanks, > > [*] <http://trac.geoext.org/wiki/Release/Procedure> > > -- > Eric Lemoine > > Camptocamp France SAS > Savoie Technolac, BP 352 > 73377 Le Bourget du Lac, Cedex > > Tel : 00 33 4 79 44 44 96 > Mail : [email protected] > http://www.camptocamp.com > _______________________________________________ > Dev mailing list > [email protected] > http://www.geoext.org/cgi-bin/mailman/listinfo/dev > -- Geospatial Director Camptocamp SA Cédric Moullet PSE A CH-1015 Lausanne www.camptocamp.com / www.mapfish.org / twitter.com/cedricmoullet / mapfishblog.blogspot.com/ +41 79 759 69 83 (mobile) +41 21 619 10 21 (direct) +41 21 619 10 10 (centrale) +41 21 619 10 00 (fax)
_______________________________________________ Dev mailing list [email protected] http://www.geoext.org/cgi-bin/mailman/listinfo/dev
