Aaron Mulder wrote:
What is the point of the "frozen list"? At this point, it doesn't appear to have stopped development of things that aren't on the list.

The list for what we are agreeing to go into M5. If something isn't on the list and its an added bonus, then fine. We need a closure date at this point. I think we have all agreed what is minimally in the cut.


        Maybe we should make the branch like Friday, so any code not on
the list has to go into HEAD, and just have a longer closing period to
resolve the list items.  There is a lot on the list, so that would mean a
lot of merges to HEAD, but unless everyone is willing to hold off on
non-list items, I'm not sure we're actually moving toward greater stability in the mean time.

Ok..shall we branch on Friday? Anhyone have any issues with this? I am game.


I'll take another look at the list items and try to pick out my "must haves", but it'll probably be late tomorrow or Thursday. I'd really like to get a lot of the issues looked at, since I think they could be easily closed or evaluated and deferred, so it would be great if people would take a quick pass through the open M5 items.

http://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&mode=hide&sorter/order=DESC&sorter/field=priority&resolution=-1&pid=10220&fixfor=12310168

Thanks,
        Aaron

On Tue, 6 Sep 2005, Jeff Genender wrote:

Now that we frozen the list for what will go into M5, and based on the
answers for QA/release dates, I propose the QA cut for M5 to occur on Sept
21, followed by a release on September 28.

Jeff