for a SPEC change (unless there was a bug) it makes more sense for a full point release change and
not a dot release. Dot releases should be limited to bug, stability and performance related
improvements.
Rick McGuire wrote:
Alan D. Cabrera wrote:
Rick McGuire wrote:
Kevan Miller wrote:
Rick,
If you're updating javamail, you need to update the version number
for the javamail spec.
--kevan
I was sort of wondering if anything needed to be done there. I
assume it should be changed from 1.1 to 1.1.1?
1.2-SNAPSHOT please.
I don't have a problem with changing it to 1.2-SNAPSHOT, but I'd like to
understand the rationale behind the choice in case it comes up in the
future.
Rick
Regards,
Alan