Actually I've been able close out about 7 of them, there are still 15 patches currently targeted for 1.1.1 which need to be looked at.  (2 of them for openejb)

On Jul 21, 2006, at 11:54 AM, Matt Hogstrom wrote:

All,

I am attempting to get some vacation time in this week so I haven't been too active on the list or doing work.  There are still most of the JIRAs for 1.1.1 our there for consumption.  The ones assigned to me are fair game and if you have some extra cycles and can help please feel free to take any of the JIRAs for me and assign them to yourself.

Current course and speed I think we've closed 1 or 2 thanks to Sachin.

Any and all help is appreciated to get 1.1.1 done by the end of next week.

Thanks in advance.

Matt


-sachin