Ok, I'm setting up SVK so that we can keep changes between the new 1.2 Branch and Trunk in sync. I
don't mean to be too simplistic but I would like to verify these assumptions on my part are correct
(before I do anything untoward):
1. The primary intent will be to ensure that changes made in the 1.2 Branch will get merged into
Trunk. Ideally these will be fixes and/or enhancements that have been made to the 1.2 Branch that
must also be ported into Trunk as well.
2. Changes made to Trunk will NOT be merged into the 1.2 Branch. This should pretty much be business
as usual (it would be very difficult to try to identify just code fixes in Trunk that have to be
retrofitted back into the 1.2 Branch).
This seem reasonable to everyone ??
Thanks much
Tim