[ https://issues.apache.org/activemq/browse/AMQCPP-29?page=all ]
Timothy Bish resolved AMQCPP-29.
--------------------------------
Resolution: Fixed
I've submitted new VC2005 project files and a solution file under the
vc2005-build folder that now will build correctly without building over each
other. Old VC2005 files at the top level have been removed.
> Projects in MSVC build building on top of one another
> -----------------------------------------------------
>
> Key: AMQCPP-29
> URL: https://issues.apache.org/activemq/browse/AMQCPP-29
> Project: ActiveMQ C++ Client
> Issue Type: Bug
> Affects Versions: 1.1
> Reporter: Albert Strasheim
> Assigned To: Timothy Bish
> Priority: Minor
> Fix For: 1.1
>
> Attachments: activemq-cpp-winbuild.diff
>
>
> After I've done a complete Debug build on Windows with MSVC 2005, building
> the solution again still yields the following each time I build:
> 1>------ Build started: Project: vs2005-activemq-example, Configuration:
> Debug Win32 ------
> 1>Linking...
> 1>Embedding manifest...
> 1>Build log was saved at
> "file://c:\home\albert\work5\activemq-cpp\Debug\BuildLog.htm"
> 1>vs2005-activemq-example - 0 error(s), 0 warning(s)
> ========== Build: 1 succeeded, 0 failed, 3 up-to-date, 0 skipped ==========
> I think this relinking might have something to do with the tests and
> activemq-example all containing a main.cpp with is built as main.obj in the
> Debug directory.
> You might consider setting up the Windows builds as follows (idea borrowed
> from many other projects I've looked at):
> top level of project
> \win_build
> \win_build\solution.sln
> \win_build\project1.sln
> \win_build\project2.sln
> \win_build\Debug (output directory)
> \win_build\Release (output directory)
> \win_build\project1\Debug (intermediate directory)
> \win_build\project1\Release (intermediate directory)
> \win_build\project2\Debug (intermediate directory)
> \win_build\project2\Release (intermediate directory)
> To achieve this, each project's output directory for each build is set to
> (SolutionDir)$(ConfigurationName) and the intermediate directory is set to
> $(SolutionDir)$(ProjectName)\$(ConfigurationName) (note the extra \).
> This setup keeps all the Windows output out of the top level directory, and
> prevents projects from building on top of one another.
> With this setup, you need to refer to src\main as ..\src\main, etc.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://issues.apache.org/activemq/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira