[
https://issues.apache.org/jira/browse/GOBBLIN-1799?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Urmi Mustafi updated GOBBLIN-1799:
----------------------------------
Summary: Fix total add spec time and number of scheduled flows metric
(was: Fix calculation of total add spec time and number of scheduled flows
metric)
> Fix total add spec time and number of scheduled flows metric
> ------------------------------------------------------------
>
> Key: GOBBLIN-1799
> URL: https://issues.apache.org/jira/browse/GOBBLIN-1799
> Project: Apache Gobblin
> Issue Type: Improvement
> Reporter: Urmi Mustafi
> Priority: Major
>
> The total add spec time and number of scheduled flows are being incremented
> even when we decided to skip flows far out into the future, overestimating
> these values by a large amount.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)