[ 
https://issues.apache.org/jira/browse/GOBBLIN-2148?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Abhishek Jain closed GOBBLIN-2148.
----------------------------------

> Cancelling a GaaS Temporal job should terminate both the Az and Temporal Job
> ----------------------------------------------------------------------------
>
>                 Key: GOBBLIN-2148
>                 URL: https://issues.apache.org/jira/browse/GOBBLIN-2148
>             Project: Apache Gobblin
>          Issue Type: Bug
>            Reporter: Abhishek Jain
>            Priority: Major
>          Time Spent: 40m
>  Remaining Estimate: 0h
>
> Currently, when GaaS Temporal job are cancelled, only the Azkaban job is 
> stopped, which stops the subsequent YARN application. However, the Temporal 
> job that is submitted by the YARN application is not stopped. We want to also 
> kill the Temporal job in order to better track our jobs and not waste 
> resources on the Temporal side.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to