[
https://issues.apache.org/jira/browse/GOBBLIN-191?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Hung Tran resolved GOBBLIN-191.
-------------------------------
Resolution: Fixed
Issue resolved by pull request #2042
[https://github.com/apache/incubator-gobblin/pull/2042]
> Make sure cron scheduler works and tune schedule period
> -------------------------------------------------------
>
> Key: GOBBLIN-191
> URL: https://issues.apache.org/jira/browse/GOBBLIN-191
> Project: Apache Gobblin
> Issue Type: Bug
> Reporter: Abhishek Tiwari
> Assignee: Abhishek Tiwari
>
> Make sure cron scheduler works and tune schedule period. Right not it is not
> copying over the required property from FlowSpec to the jobConfig in
> ServiceScheduler.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)