Why are there two staging repositories for Geb 8.0.1?
Is this expected?

I'm by no means an expert on the subject.
In the Grails project we create and close the staging repository
before the vote.
After the vote passes, we release the artifacts.

It looks like the orgapachepaimon-1133 also had a failed close with
"Operation aborted" (user yuzelin).
It then succeeded on the next try. Maybe you can reach out to yuzelin
to hear what was wrong?

/Mattias


Den mån 17 nov. 2025 kl 18:38 skrev Jonny <[email protected]>:
>
> Last week, I tried to close the staging repositories for the Geb 8.0.1 
> release after the vote had passed. These are visible to me at 
> https://repository.apache.org/#stagingRepositories.
>
> I recall doing this for 8.0.0 without issue, though my memory may be hazy.
>
> The close failed, and both repositories now sit with the last step saying 
> "Operation Aborted", as shown in the attached screenshot.
>
> Is this something someone on the Groovy PMC should resolve, or is it 
> something that I should take to the folks on the Apache Infra team?
>
> Thanks for the help,
>
> Jonny Carter

Reply via email to