Amitanand Aiyer created HBASE-8216:
--------------------------------------

             Summary: Be able to differentiate Power failures from Rack switch 
reboot
                 Key: HBASE-8216
                 URL: https://issues.apache.org/jira/browse/HBASE-8216
             Project: HBase
          Issue Type: Bug
            Reporter: Amitanand Aiyer
            Assignee: Amitanand Aiyer
            Priority: Minor
             Fix For: 0.89-fb


The master in 0.89-fb waits for 5-6 mins to check if RS'es become accessible; 
when it sees a co-related failure such as a rack-switch-reboot.

The rationale behind doing this is that it is not worth assigning and 
reassigning regions -- causing churn, when the rack switch reboots are expected 
to heal themselves in 5-6 mins. In earlier deployments, where this feature was 
not present, we used to find ourselves in a bad situation for 30mins-1hr.

However, co-related failures also happen when there is a power failure for the 
rack. These cases take much longer to heal; so waiting for 5-6 mins is a wasted 
effort.

The master should be able to differentiate the two scenario, by checking if 
*any* of the RS in the rack is able to communicate. Unless all the servers in 
the rack are unaccessible, we should proceed with reassigning the regions.


--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to