On Thu, Aug 22, 2013 at 1:36 PM, Stack <[email protected]> wrote: > > I > f we can introduce HBASE-6721 into 0.96 at some point, then you could set > > up placement groups first, and then deploy 0.98 to one placement group, > > online migrate the table(s) placed there, stay in this configuration for > > days or weeks, and the rest of the cluster and all of the clients would > be > > fine with that. > > > > > Ohh. That'd be sweet. I don't want to put it in way of a 0.96 though. I > want to do a 0.96.0RC0 on Monday so no destabilizations between here and > there?.
Sure. The placement group stuff is not ready. What do you think about bringing it in to 0.96.x at some point? -- Best regards, - Andy Problems worthy of attack prove their worth by hitting back. - Piet Hein (via Tom White)
