Ted Yu created HBASE-9651:
-----------------------------

             Summary: Backport HBASE-3890 'Scheduled tasks in distributed log 
splitting not in sync with ZK' to 0.94
                 Key: HBASE-9651
                 URL: https://issues.apache.org/jira/browse/HBASE-9651
             Project: HBase
          Issue Type: Bug
            Reporter: Ted Yu
            Assignee: Ted Yu
             Fix For: 0.94.13
         Attachments: 9651.patch

HBASE-3890 was fixed in 0.96 and trunk. This issue is to backport to 0.94

Note that there must be more slightly off here. Although the splitlogs znode is 
now empty the master is still stuck here:
{code}
Doing distributed log split in 
hdfs://localhost:8020/hbase/.logs/10.0.0.65,60020,1305406356765  
- Waiting for distributed tasks to finish. scheduled=2 done=1 error=0   4380s

Master startup  
- Splitting logs after master startup   4388s
{code}
There seems to be an issue with what is in ZK and what the TaskBatch holds. In 
my case it could be related to the fact that the task was already in ZK after 
many faulty restarts because of the NPE. Maybe it was added once (since that is 
keyed by path, and that is unique on my machine), but the reference count upped 
twice? Now that the real one is done, the done counter has been increased, but 
will never match the scheduled.


--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to